求翻譯:The construction theory is driving a casing pipe based in design depth and gap distance to form pipes, sinking the sand into reserved ungerground depth from the bottom with valve tube boots, pressing sand from bottom valve and replenish unceasingly until sand drain is formed.是什么意思?![]() ![]() The construction theory is driving a casing pipe based in design depth and gap distance to form pipes, sinking the sand into reserved ungerground depth from the bottom with valve tube boots, pressing sand from bottom valve and replenish unceasingly until sand drain is formed.
問題補充: |
|
2013-05-23 12:21:38
建設理論駕駛套管形成管道的設計深度和間隙距離的沙子從底部閥門管靴,下沉將保留ungerground深度的,按從沙底閥,并不斷補充,直到形成砂井。
|
|
2013-05-23 12:23:18
建筑理論是基于駕駛一個套管的設計深度和距離,形成管道,沉沒到保留的沙子ungerground深度從底部啟動時與閥管,按下沙從底部閥門和補充不斷直到沙排放就形成了。
|
|
2013-05-23 12:24:58
建筑理論駕駛設計深度和空白距離根據的框管子到形式管子,下沉沙子入后備的ungerground深度從底部與閥門管起動,按沙子從底下閥門并且不斷地重新補充,直到排水砂樁被形成。
|
|
2013-05-23 12:26:38
建設理論駕駛設在管道,沉入保留的 ungerground 深度的沙子從底部與閥門管壓砂從底閥的靴子和不斷補充,直至組建砂井設計深度和間隙距離的套管。
|
|
2013-05-23 12:28:18
建造理論在弄得一只 casing 煙斗位于設計深度和缺乏形成煙斗,到來自有閥門管子的底部的保留的 ungerground 深度中使沙下沉的距離引導,按沙最后的閥門和 unceasingly 被裝滿直到沙排水被形成。
|