求翻譯:All equipment and work detailed within this section shall be furnished and installed by a certified Data & telecommunications contractor, hereafter referred to as the Contractor. The Electrical Contractor shall furnish and install the conduit, electrical boxes, and pull-wires.是什么意思?![]() ![]() All equipment and work detailed within this section shall be furnished and installed by a certified Data & telecommunications contractor, hereafter referred to as the Contractor. The Electrical Contractor shall furnish and install the conduit, electrical boxes, and pull-wires.
問題補充: |
|
2013-05-23 12:21:38
|
|
2013-05-23 12:23:18
所有的設備和工作中詳細說明本節應布置和安裝的一個經認證的數據和電信承建商,以下簡稱“承包商。 該電業承辦商須提供和安裝的管道、電氣接線盒,并將其拉出的線。
|
|
2013-05-23 12:24:58
正在翻譯,請等待...
|
|
2013-05-23 12:26:38
所有的設備和在這一節中詳細介紹的工作須提交,而安裝的經核證的數據科技電訊承包商,以下簡稱承建商。電業承辦商須提供并安裝管道、 電器盒和拉電線。
|
|
2013-05-23 12:28:18
都設備和工作詳細說明在這個部分內將被一個已認證的數據和電信承包商布置和安裝,將來被稱為承包商。電承包商將供應和安裝渠道,電盒子,拉電線。
|