|
關(guān)注:1
2013-05-23 12:21
求翻譯:積極準(zhǔn)備管道氣供氣的工作,計劃于5月實現(xiàn)供氣。是什么意思?![]() ![]() 積極準(zhǔn)備管道氣供氣的工作,計劃于5月實現(xiàn)供氣。
問題補(bǔ)充: |
|
2013-05-23 12:21:38
Actively preparing for the work of the pipeline gas supply, planned for May supply.
|
|
2013-05-23 12:23:18
to pipe the GAS gas, which is planned for the 5 months on air.
|
|
2013-05-23 12:24:58
Prepares the pipeline to be mad positively the air feed the work, plans in May realizes the air feed.
|
|
2013-05-23 12:26:38
Actively prepare pipeline gas supply work, planned for May achieve air supply.
|
|
2013-05-23 12:28:18
正在翻譯,請等待...
|
湖北省互聯(lián)網(wǎng)違法和不良信息舉報平臺 | 網(wǎng)上有害信息舉報專區(qū) | 電信詐騙舉報專區(qū) | 涉歷史虛無主義有害信息舉報專區(qū) | 涉企侵權(quán)舉報專區(qū)