|
關(guān)注:1
2013-05-23 12:21
求翻譯:設(shè)計(jì)師通過(guò)運(yùn)用新式工具,改變了以往方案設(shè)計(jì)的思維方式;承建方由于得到新型的圖紙信息,改變了傳統(tǒng)的操作流程;管理者則因使用統(tǒng)籌信息的新技術(shù),改變其前前后后工作日程、人事安排等一系列任務(wù)的分配方法。是什么意思?![]() ![]() 設(shè)計(jì)師通過(guò)運(yùn)用新式工具,改變了以往方案設(shè)計(jì)的思維方式;承建方由于得到新型的圖紙信息,改變了傳統(tǒng)的操作流程;管理者則因使用統(tǒng)籌信息的新技術(shù),改變其前前后后工作日程、人事安排等一系列任務(wù)的分配方法。
問(wèn)題補(bǔ)充: |
|
2013-05-23 12:21:38
Through the use of new tools, the designer has changed the way of thinking of the previous design; the construction side, the new drawings, change the traditional operational processes; managers due to co-ordinate information technology, changing the Ins and Outs of work schedule the distribution of
|
|
2013-05-23 12:23:18
The designer through the use of new tools to change programs have been designed way of thinking; contractors because of the New Party's drawings, has changed the traditional operating processes; managers use the co-ordination of information technology, and change its darker side work schedule, perso
|
|
2013-05-23 12:24:58
The designer through the utilization new style tool, changed the former project design thinking mode; Because the construction only then obtains the new blueprint information, changed the traditional operation flow; Then the superintendent because of the use overall plan information new technology,
|
|
2013-05-23 12:26:38
Designers through the use of new tools, changed the way of thinking of design in the past; drawings Contracting Party because of the new information, changed the traditional procedures; for using integrated information technology manager, changed their course schedule, staffing and so on a series of
|
|
2013-05-23 12:28:18
正在翻譯,請(qǐng)等待...
|
湖北省互聯(lián)網(wǎng)違法和不良信息舉報(bào)平臺(tái) | 網(wǎng)上有害信息舉報(bào)專(zhuān)區(qū) | 電信詐騙舉報(bào)專(zhuān)區(qū) | 涉歷史虛無(wú)主義有害信息舉報(bào)專(zhuān)區(qū) | 涉企侵權(quán)舉報(bào)專(zhuān)區(qū)