|
關注:1
2013-05-23 12:21
求翻譯:The requirement for controls at each crossing will be determined during the reail safety risk assessment in detailed design. For the BFS all Public “At-Grade” Crossings have been assumed to be under active control. Where there is an “At-Grade” interface with the Alpha Coal Project Railway and the NSRN it has been assum是什么意思?![]() ![]() The requirement for controls at each crossing will be determined during the reail safety risk assessment in detailed design. For the BFS all Public “At-Grade” Crossings have been assumed to be under active control. Where there is an “At-Grade” interface with the Alpha Coal Project Railway and the NSRN it has been assum
問題補充: |
|
2013-05-23 12:21:38
在各個口岸的控制要求,將取決于在詳細設計reail安全風險評估。有關的BFS被假定為主動控制下的所有公共的“地面”錯愛。哪里有“地面”阿爾法煤炭項目的鐵路,它已被假設的黑臉琵鷺,這些USRN訪問的用戶將被要求與權限交叉對齊通信的列車控制的目的NSRN接口。對于所有的BFS NSRC已經沒有任何主動控制的要求而設計。股票走勢將控制整個對齊通過musterers和列車控制提供accsss跨對齊門之間的通信。
|
|
2013-05-23 12:23:18
管制的要求在每個通道將確定在reail安全風險評估的詳細設計。 黑臉琵鷺覓食的所有公共"at-grade"過境點已經假定為根據積極控制。 有一個"at-grade"接口的alpha煤項目鐵路和nsrn,已假設為施行《黑臉琵鷺覓食,用戶的訪問將需要這些usrn溝通,列車控制申請,字的路線。
|
|
2013-05-23 12:24:58
|
|
2013-05-23 12:26:38
Reail 安全風險評估的詳細設計過程中將確定控件在每個十字路口的要求。高爐所有公共"在級"過路處有被假定為主動控制下。凡有"在級"接口%E
|
|
2013-05-23 12:28:18
|
湖北省互聯網違法和不良信息舉報平臺 | 網上有害信息舉報專區 | 電信詐騙舉報專區 | 涉歷史虛無主義有害信息舉報專區 | 涉企侵權舉報專區