|
關(guān)注:1
2013-05-23 12:21
求翻譯:高陡的路塹邊坡地段,塹坡開挖后可能引起坍塌,設(shè)置路塹樁板墻等預(yù)加固措施,樁板墻采用鋼筋混凝土澆筑是什么意思?![]() ![]() 高陡的路塹邊坡地段,塹坡開挖后可能引起坍塌,設(shè)置路塹樁板墻等預(yù)加固措施,樁板墻采用鋼筋混凝土澆筑
問題補(bǔ)充: |
|
2013-05-23 12:21:38
High steep cutting slope lots, cutting slope after excavation may cause collapse, set the pile wall cutting measures such as pre-reinforcement, pouring reinforced concrete pile wall
|
|
2013-05-23 12:23:18
high and steep slope side of the road, their slope paragraph after excavation collapse may give rise to set up their piles, such as wall panels, pre-reinforcement measures reinforced concrete piles used GEM wall pouring
|
|
2013-05-23 12:24:58
Gao Dou the slope of cut land sector, after the moat slope excavates possibly causes caves in, the establishment cuts the pile wooden fence and so on the pre-reinforcement measure, the pile wooden fence uses the reinforced concrete construction
|
|
2013-05-23 12:26:38
High-steep slope of lots in slope excavation may cause collapse, set pre-measures such as cutting sheet pile wall, pile-sheet retaining wall with reinforced concrete
|
|
2013-05-23 12:28:18
The slope location by the high and steep cutting, the slope may cause that collapse after excavating, set up a board of cutting,etc. and strengthen the measure in advance in the moat, a board adopts the armored concrete to build
|
湖北省互聯(lián)網(wǎng)違法和不良信息舉報(bào)平臺(tái) | 網(wǎng)上有害信息舉報(bào)專區(qū) | 電信詐騙舉報(bào)專區(qū) | 涉歷史虛無主義有害信息舉報(bào)專區(qū) | 涉企侵權(quán)舉報(bào)專區(qū)