求翻譯:錦屏二級水電站引水隧洞埋深大,地應力高,巖爆問題突出,是本工程主要技術難題之一,結合該工程TBM巖爆段施工所遇見的巖爆現象、危害以及防治措施,總結TBM巖爆開挖經驗,供類似工程借鑒。是什么意思?![]() ![]() 錦屏二級水電站引水隧洞埋深大,地應力高,巖爆問題突出,是本工程主要技術難題之一,結合該工程TBM巖爆段施工所遇見的巖爆現象、危害以及防治措施,總結TBM巖爆開挖經驗,供類似工程借鑒。
問題補充: |
|
2013-05-23 12:21:38
[object Object]
|
|
2013-05-23 12:23:18
正在翻譯,請等待...
|
|
2013-05-23 12:24:58
The beautiful screen two level of hydroelectric power station derivation tunnel burying depth is big, the crustal stress is high, the rock burst question is prominent, is one of this project main technology difficult problems, the knot shoulds the project TBM rock burst section construction to meet
|
|
2013-05-23 12:26:38
Jinping hydropower station diversion tunnel buried deep, high stress and rock burst issues outstanding, is one of the main technical challenges of this project, in conjunction with the project of rock burst in TBM construction met, harms and control measures of rock burst, summary of TBM excavation
|
|