|
關注:1
2013-05-23 12:21
求翻譯:處理方式:經與基建施工方溝通,將雨水排放管向右接個45度彎頭,從而避開電線槽,并于當日完成。是什么意思?![]() ![]() 處理方式:經與基建施工方溝通,將雨水排放管向右接個45度彎頭,從而避開電線槽,并于當日完成。
問題補充: |
|
2013-05-23 12:21:38
Approach: communication with the capital construction side, the drainage tube to the right will take a 45 degree elbow, and thus avoid the wire slots on the same day to complete.
|
|
2013-05-23 12:23:18
正在翻譯,請等待...
|
|
2013-05-23 12:24:58
Processing mode: After with the capital construction construction side communication, towards right meets the rain water eductor 45 degree bend, thus avoids the wiring duct, and completes in the same day.
|
|
2013-05-23 12:26:38
Approach: by communicating with infrastructure construction, drainage tubes 45 degrees to the right elbow, so as to avoid the wire slot, and finish the day.
|
|
2013-05-23 12:28:18
|
湖北省互聯網違法和不良信息舉報平臺 | 網上有害信息舉報專區 | 電信詐騙舉報專區 | 涉歷史虛無主義有害信息舉報專區 | 涉企侵權舉報專區