|
關(guān)注:1
2013-05-23 12:21
求翻譯:本標(biāo)準(zhǔn)規(guī)定了船舶絞纜機(jī)安裝前應(yīng)具備的條件及準(zhǔn)備工作,絞纜機(jī)的內(nèi)場組裝及船上安裝順序和工藝等要求是什么意思?![]() ![]() 本標(biāo)準(zhǔn)規(guī)定了船舶絞纜機(jī)安裝前應(yīng)具備的條件及準(zhǔn)備工作,絞纜機(jī)的內(nèi)場組裝及船上安裝順序和工藝等要求
問題補(bǔ)充: |
|
2013-05-23 12:21:38
This standard specifies the conditions and preparation before the installation of the ship winch should have within the field of the cable cutter assembly and installation on board the order and process requirements
|
|
2013-05-23 12:23:18
This standard specifies the ship twisted pair cable machines should be installed before the conditions and to prepare for the twisted pair cable, in the assembled and installed on the ship, such as sequence and process
|
|
2013-05-23 12:24:58
Before this standing operating procedure ships warping winch installment should have the condition and the preparatory work, on the warping winch infield assembly and the ship installs requests and so on order and craft
|
|
2013-05-23 12:26:38
This standard provides for a ship mooring winch installation should have the condition and ready to work, mooring winch's field-Assembly and installation on Board order and process requirements
|
|
2013-05-23 12:28:18
The plate entangles into a cable machine
|
湖北省互聯(lián)網(wǎng)違法和不良信息舉報平臺 | 網(wǎng)上有害信息舉報專區(qū) | 電信詐騙舉報專區(qū) | 涉歷史虛無主義有害信息舉報專區(qū) | 涉企侵權(quán)舉報專區(qū)