|
關注:1
2013-05-23 12:21
求翻譯:小船靠泊并與裝船臂對接后,LNG通過新增低壓泵加壓后,經支管匯集到總管輸送至碼頭裝料臂對小船進行裝料。是什么意思?![]() ![]() 小船靠泊并與裝船臂對接后,LNG通過新增低壓泵加壓后,經支管匯集到總管輸送至碼頭裝料臂對小船進行裝料。
問題補充: |
|
2013-05-23 12:21:38
Boat berthing and docking with the loading arm, lng, which is pressurized by new low-pressure pump, the branch pipe collection Explorer transported to the terminal loading arm on the boat loading.
|
|
2013-05-23 12:23:18
small boat docked at loading the boat and with his arm, after docking LNG through new low pressure pump pressure, after the pool to the mains supply to terminal arm 1,153,200 to 1,153,200 for small boats.
|
|
2013-05-23 12:24:58
The boat anchors and after shipment arm docking, LNG after increases the low press pump compression, collects the main pipe after the branch to transport to the wharf feeds the arm to carry on to the boat feeds.
|
|
2013-05-23 12:26:38
After the boat berthing and docking with the arms shipment, after LNG through low pressure pumps pressure through pipes assembled into common bile duct to the boat dock loading arm to be charging.
|
|
2013-05-23 12:28:18
null
|
湖北省互聯網違法和不良信息舉報平臺 | 網上有害信息舉報專區 | 電信詐騙舉報專區 | 涉歷史虛無主義有害信息舉報專區 | 涉企侵權舉報專區