求翻譯:The costs of civil works are calculated based on the quantities of materials and unit prices. The unit prices are based on the actual project conditions and the assumed sources of labor, materials and construction machinery. The unit prices of the equipment such as electro-mechanical equipment, hydraulic equipment and 是什么意思?![]() ![]() The costs of civil works are calculated based on the quantities of materials and unit prices. The unit prices are based on the actual project conditions and the assumed sources of labor, materials and construction machinery. The unit prices of the equipment such as electro-mechanical equipment, hydraulic equipment and
問題補充: |
|
2013-05-23 12:21:38
土建工程的費用是基于材料的數量和單位價格計算。單位價格是根據實際項目的條件和勞動力,材料和施工機械的假設來源。如機電設備,液壓設備和傳輸系統的設備單位價格基礎上的制造商。金融項目成本計算的基礎上的直接成本,物理應變,利潤,稅收,管理和工程費。
|
|
2013-05-23 12:23:18
土木工程的費用的計算是根據材料的數量和單位價格。 該股價格是基于實際的項目的條件和假定的勞工來源、材料及建筑機器。 該股的價格的設備,例如機電設備、液壓設備和傳送系統所根據的制造商。 項目的財政費用的計算是根據直接費用、身體應變、溢利、稅務、管理和工程費用。
|
|
2013-05-23 12:24:58
|
|
2013-05-23 12:26:38
土建工程的費用是根據大量的材料和單位價格計算的。單位價格根據項目實際條件和勞動、 材料和工程機械的假定的來源。機電一體化設備、 液壓設備和傳輸系統等設備的單位價格基于制造商。金融工程費用是根據計算直接成本、 物理應急、 利潤、 稅收、 管理和工程費用。
|
|
2013-05-23 12:28:18
|
湖北省互聯網違法和不良信息舉報平臺 | 網上有害信息舉報專區 | 電信詐騙舉報專區 | 涉歷史虛無主義有害信息舉報專區 | 涉企侵權舉報專區