2013-05-23 12:21
求翻譯:(1) Since PH-2201 and DV-2201 is operated at high temperature and vacuum,hot bolting by heating should be done before start-up.vacuum test should be done by starting the vacuum pump and leakage is checked.是什么意思?![]() ![]() (1) Since PH-2201 and DV-2201 is operated at high temperature and vacuum,hot bolting by heating should be done before start-up.vacuum test should be done by starting the vacuum pump and leakage is checked.
問題補充: |
|
2013-05-23 12:21:38
(1)自PH - 2201,DV - 2201是在高溫和真空,加熱螺栓熱的操作應該做啟動up.vacuum測試前應啟動真空泵和泄漏檢查。
|
|
2013-05-23 12:23:18
(1)自 PH -2201和 dv -2201經營是在高溫和真空冷熱水加熱以前要做的螺栓開辦。真空測試工作應由開始的真空泵和滲漏是檢查。
|
|
2013-05-23 12:24:58
(1)從PH-2201和DV-2201被管理在高溫度和真空,熱閂上由熱化應該完成,在開始up.vacuum測試應該由發動真空泵完成之前,并且漏出被檢查。
|
|
2013-05-23 12:26:38
(1) 由于 PH-2201年和 DV-2201年操作在高溫和真空,加熱的熱錨應完成之前應該通過啟動真空泵開始 up.vacuum 測試和檢查泄漏。
|
|