|
關注:1
2013-05-23 12:21
求翻譯:It is interesting to note, for instance, that the transmission line currents in the simulation case described above are not symmetrical in steady-state. To accentuate the un. balance, the load at the receiving end may be removed. It can then be observed that the ‘B’ Phase current is approximately 10% higher than the ‘A是什么意思?![]() ![]() It is interesting to note, for instance, that the transmission line currents in the simulation case described above are not symmetrical in steady-state. To accentuate the un. balance, the load at the receiving end may be removed. It can then be observed that the ‘B’ Phase current is approximately 10% higher than the ‘A
問題補充: |
|
2013-05-23 12:21:38
正在翻譯,請等待...
|
|
2013-05-23 12:23:18
值得注意的是,例如,在模擬傳輸線電流上述案件不對稱的穩定狀態。 ,加劇了聯合國。 平衡、《負載在接受完可予以取消。 它可以指出,'b'階段目前為約10%的高於“A”和“C”階段水流。 長傳輸線路常常移位,以平衡線電流。 有兩種方法包括transpostion入rtds模擬案件。
|
|
2013-05-23 12:24:58
|
|
2013-05-23 12:26:38
很有趣地注意到,例如,上文所述的模擬情況輸電線路電流不對稱的穩定狀態。強調聯合國。在接收端的負載平衡,可能會被刪除。然后可以觀察 'B' 相電流是大約 10%的 'A' 和 'C' 比高相電流。長輸電線路是經常換位,以平衡線電流。有兩種方法來包含 transpostion 到 RTDS 模擬案例。第一,可顯式參照 transpostion 輸電線路將分成三個部分的長度相等。在第 1 和第 2 條之間
|
|
2013-05-23 12:28:18
|
湖北省互聯網違法和不良信息舉報平臺 | 網上有害信息舉報專區 | 電信詐騙舉報專區 | 涉歷史虛無主義有害信息舉報專區 | 涉企侵權舉報專區