求翻譯:The positioning of the equipment shall be aligned with U-type level pipe, with the anchor bolts screwed and the slide plates double bolted, the transversal and longitudinal levelness be in accordance with the requirements of the relevant specifications. After the installation of the piping but before commissioning, the是什么意思?![]() ![]() The positioning of the equipment shall be aligned with U-type level pipe, with the anchor bolts screwed and the slide plates double bolted, the transversal and longitudinal levelness be in accordance with the requirements of the relevant specifications. After the installation of the piping but before commissioning, the
問題補充: |
|
2013-05-23 12:21:38
正在翻譯,請等待...
|
|
2013-05-23 12:23:18
正在翻譯,請等待...
|
|
2013-05-23 12:24:58
安置設備與U類型水平管子將排列,當固定螺栓被擰緊,并且幻燈片板材雙被閂上的,橫截和縱向水平是與相關的規格的要求符合。 在管道系統的設施以后,但在委任之前,加熱器的螺栓將是被檢查的扭矩,一般幻燈片板材的堅果將是從固定螺栓- 3mm松開的1,以便加熱器可能自由地擴展和收縮。
|
|
2013-05-23 12:26:38
定位的設備須符合 U 型管水平,擰的錨定螺栓和滑板雙螺栓,橫向和縱向平整度須按照有關規范的要求。安裝之后的管道,但調試之前,加熱器的螺栓須簽的扭矩,一般的滑板螺母須 1-3 毫米松綁的錨定螺栓,使加熱器可以展開和合同自由。
|
|
2013-05-23 12:28:18
正在翻譯,請等待...
|
湖北省互聯網違法和不良信息舉報平臺 | 網上有害信息舉報專區 | 電信詐騙舉報專區 | 涉歷史虛無主義有害信息舉報專區 | 涉企侵權舉報專區