求翻譯:給料機出廠前已進行時間不少于四小時的空載試車,設備在現場安裝調整完畢后應進行短期試運轉,以配伍生產流量;調節料倉閘門的開度,改變料層厚度,達到調節給料機生產率的目的。是什么意思?![]() ![]() 給料機出廠前已進行時間不少于四小時的空載試車,設備在現場安裝調整完畢后應進行短期試運轉,以配伍生產流量;調節料倉閘門的開度,改變料層厚度,達到調節給料機生產率的目的。
問題補充: |
|
2013-05-23 12:21:38
正在翻譯,請等待...
|
|
2013-05-23 12:23:18
正在翻譯,請等待...
|
|
2013-05-23 12:24:58
Before the feeding engine exwork has carried on the time many in four hour idling tests run, the equipment finished after the scene installment adjustment should carry on the short-term test run, blends the production current capacity; The adjustment bunker strobe opening, change material level thic
|
|
2013-05-23 12:26:38
Feeder had no less than four hours before delivery of the no-load test, equipment installation and adjustment at the scene after the test run on a short-term basis, so as to compatibility of production flow; regulation of hopper gate opening, changing thickness of materials, to adjust the feeder pro
|
|