|
關注:1
2013-05-23 12:21
求翻譯:The foundation shall be checked and confirmed showing survey records, elevation, datum line, transversal and longitudinal centerline marked on the foundation and settling measuring point, ready for the installation of heavy-duty equipment.是什么意思?![]() ![]() The foundation shall be checked and confirmed showing survey records, elevation, datum line, transversal and longitudinal centerline marked on the foundation and settling measuring point, ready for the installation of heavy-duty equipment.
問題補充: |
|
2013-05-23 12:21:38
正在翻譯,請等待...
|
|
2013-05-23 12:23:18
該基金會須予檢查,并證實調查記錄顯示,提升、基準線,橫向和縱向中線標志在基礎和解決量度點,作好準備,在安裝的重型設備。
|
|
2013-05-23 12:24:58
基礎將被檢查和被證實的在基礎和安定的測量點標記的陳列調查紀錄、海拔,基準線,橫截和縱向中心線,準備好耐用設備的設施。
|
|
2013-05-23 12:26:38
基礎應是檢查和確認顯示調查記錄、 高程、 基準線,橫向和縱向中心線標記的基礎和沉降測量點,準備重型設備的安裝。
|
|
2013-05-23 12:28:18
正在翻譯,請等待...
|
湖北省互聯網違法和不良信息舉報平臺 | 網上有害信息舉報專區 | 電信詐騙舉報專區 | 涉歷史虛無主義有害信息舉報專區 | 涉企侵權舉報專區