|
關注:1
2013-05-23 12:21
求翻譯:工地停工,必須提前報知工程部巡檢,或工程部經理,停電、停水、無法施工,應及時報知工程部是什么意思?![]() ![]() 工地停工,必須提前報知工程部巡檢,或工程部經理,停電、停水、無法施工,應及時報知工程部
問題補充: |
|
2013-05-23 12:21:38
Site downtime must be reported to Engineering Department inspection in advance, or project manager, power, water supply, could not be implemented, and the Times know that engineering should be
|
|
2013-05-23 12:23:18
Site downtime must be made in advance notification Engineering Department, or engineering manager Byeolsungeom, electricity, water, unable to work, and it would be timely to known works department
|
|
2013-05-23 12:24:58
The work site shuts down, must inform the engineering dept to inspect ahead of time, or engineering dept manager, the power cut, cuts off the water supply, is unable to construct, should inform the engineering dept promptly
|
|
2013-05-23 12:26:38
Site downtime, must be reported in advance engineering inspection, or Engineering Manager, power outage, suspension, not construction, should promptly report engineering
|
|
2013-05-23 12:28:18
Site downtime must be reported to Engineering Department inspection in advance, or project manager, power, water supply, could not be implemented, and the Times know that engineering should be
|
湖北省互聯網違法和不良信息舉報平臺 | 網上有害信息舉報專區 | 電信詐騙舉報專區 | 涉歷史虛無主義有害信息舉報專區 | 涉企侵權舉報專區