求翻譯:待大廈工程部人員將應急回路電源線引至傑尼亞店鋪內指定位置後,傑尼亞店電氣施工方須配合完成長明燈接線工作。是什么意思?![]() ![]() 待大廈工程部人員將應急回路電源線引至傑尼亞店鋪內指定位置後,傑尼亞店電氣施工方須配合完成長明燈接線工作。
問題補充: |
|
2013-05-23 12:21:38
正在翻譯,請等待...
|
|
2013-05-23 12:23:18
To be building works the emergency personnel of the Department loop power to kit and shops in the specified location, kit and electrical engineering Asia shops to tie in with beacon completion of the long wiring.
|
|
2013-05-23 12:24:58
Waits the building engineering dept personnel to direct the emergency return route power line after the outstanding Nepali Asia shop in to assign the position, the outstanding Nepali Asia Shop electricity constructs Fang Xu to coordinate to complete the large oil lamp lit day and night before Buddha
|
|
2013-05-23 12:26:38
Building Engineering Department staff emergency circuit supply lines to the Zegna stores within the specified location, Zegna store construction must be compatible with complete eternal fire electrical wiring work.
|
|