|
關(guān)注:1
2013-05-23 12:21
求翻譯:基礎(chǔ)施工時,應(yīng)組織相關(guān)人員進(jìn)行驗槽,如發(fā)現(xiàn)地基土與勘查報告有差異時,應(yīng)及時通知地勘及設(shè)計單位進(jìn)行處理。是什么意思?![]() ![]() 基礎(chǔ)施工時,應(yīng)組織相關(guān)人員進(jìn)行驗槽,如發(fā)現(xiàn)地基土與勘查報告有差異時,應(yīng)及時通知地勘及設(shè)計單位進(jìn)行處理。
問題補(bǔ)充: |
|
2013-05-23 12:21:38
正在翻譯,請等待...
|
|
2013-05-23 12:23:18
When construction of basis should be organized, and relevant personnel, such as post-mortem revealed that foundation and trough with prospecting, when there is a difference report shall promptly notify geological survey and design unit for processing.
|
|
2013-05-23 12:24:58
When foundation construction, should organize the correlation personnel to carry on examines the trough, when the discovery foundation soil and the investigation report has the difference, should inform to compare promptly and the designing department carries on processing.
|
|
2013-05-23 12:26:38
Foundation construction, should organize personnel to tank inspection, such as the discovery and exploration of Foundation soil reporting when there is a difference, shall promptly notify the geological prospecting and design unit for processing.
|
|
2013-05-23 12:28:18
正在翻譯,請等待...
|
湖北省互聯(lián)網(wǎng)違法和不良信息舉報平臺 | 網(wǎng)上有害信息舉報專區(qū) | 電信詐騙舉報專區(qū) | 涉歷史虛無主義有害信息舉報專區(qū) | 涉企侵權(quán)舉報專區(qū)