求翻譯:基礎施工完后,基坑及上土體均應及時回填,回填土采用素土分層夯實,壓實系數不小于0.94。在基礎回填完成前,不得進行上部結構的施工。是什么意思?![]() ![]() 基礎施工完后,基坑及上土體均應及時回填,回填土采用素土分層夯實,壓實系數不小于0.94。在基礎回填完成前,不得進行上部結構的施工。
問題補充: |
|
2013-05-23 12:21:38
正在翻譯,請等待...
|
|
2013-05-23 12:23:18
After construction of basis and at the Commonwealth Foundation pit shall timely backfilling soil quality, and back to filling used stratified solidify compacted, Coefficient is not less than 0.94 . Backfilling the Foundation shall not be carried out prior to the completion of the superstructure cons
|
|
2013-05-23 12:24:58
After the foundation constructs, the hole excavated for building foundation and on the soil body should the prompt backfill, return to the earth fill to use the element earth lamination ramming, the compacting factor is not smaller than 0.94.Completes front the foundation backfill, does not have to
|
|
2013-05-23 12:26:38
Foundation construction finishes, and Foundation pit and soil should be timely on backfill, effects of soil layer compaction of backfill soil, compaction coefficient of not less than 0.94. Foundation backfilled prior to completion of construction of the superstructure shall be carried out.
|
|
2013-05-23 12:28:18