|
關注:1
2013-05-23 12:21
求翻譯:夾緊架調整:模具安裝后,將夾緊架調至夾緊上模與切管輪同高是什么意思?![]() ![]() 夾緊架調整:模具安裝后,將夾緊架調至夾緊上模與切管輪同高
問題補充: |
|
2013-05-23 12:21:38
Clamping frame adjustments: die after installation, adjust the clamp to clamp mode and pipe cutting wheel with high
|
|
2013-05-23 12:23:18
Mold clamping structure adjustment: Immediately after the installation folder structure, will be redeployed to gripping the model and all round tube with high
|
|
2013-05-23 12:24:58
Clamp adjustment: After the mold installment, will clamp the transferring to clamp top die with to cut the engineer high with
|
|
2013-05-23 12:26:38
Clamping frame adjustments: die after installation, adjust the clamp to clamp mode and pipe cutting wheel with high
|
|
2013-05-23 12:28:18
Clamping frame adjustments: die after installation, adjust the clamp to clamp mode and pipe cutting wheel with high
|
湖北省互聯網違法和不良信息舉報平臺 | 網上有害信息舉報專區(qū) | 電信詐騙舉報專區(qū) | 涉歷史虛無主義有害信息舉報專區(qū) | 涉企侵權舉報專區(qū)