|
關注:1
2013-05-23 12:21
求翻譯:加裝填料時,每周的長度應使兩端保留適量間隙,各道填料搭口應錯開,填料裝妥后壓蓋法蘭與尾軸管凸緣平面的間距相等,壓蓋襯套內圓與軸不允許接觸,并力求上、下、左、右各方面間隙相等。是什么意思?![]() ![]() 加裝填料時,每周的長度應使兩端保留適量間隙,各道填料搭口應錯開,填料裝妥后壓蓋法蘭與尾軸管凸緣平面的間距相等,壓蓋襯套內圓與軸不允許接觸,并力求上、下、左、右各方面間隙相等。
問題補充: |
|
2013-05-23 12:21:38
Installation of packing, the length of the weekly amount should be retained at both ends of the gap, take the mouth of the channel should be staggered packing, packing gland flange and installed properly after stern tube flange plane spacing equal to the inner circle gland bushing and the axis does
|
|
2013-05-23 12:23:18
Each week, when installing fill the length should be retained so that the two end up getting adequate gap filler port, and the road should be staggered to fill installed cappers after flanges and stern tube flange flat spaced equivalent, capping lining inner circle and the shaft, and not allow acces
|
|
2013-05-23 12:24:58
When addition padding, each week length should make the both sides to retain the right amount gap, each padding builds the mouth to be supposed to stagger, after the padding loaded properly gland flange and the screw shaft pipe flange plane spacing is equal, the gland bushing internal bore and the a
|
|
2013-05-23 12:26:38
Plus when loading material per week should make reservations at both ends of the length of the amount of clearance, various packing lap should be staggered, fill completed post-gaifalan and a stern tube flange surface spacing equal, gland bushing inner contact with axis is not allowed, and seeks cle
|
|
2013-05-23 12:28:18
正在翻譯,請等待...
|
湖北省互聯網違法和不良信息舉報平臺 | 網上有害信息舉報專區 | 電信詐騙舉報專區 | 涉歷史虛無主義有害信息舉報專區 | 涉企侵權舉報專區