|
關注:1
2013-05-23 12:21
求翻譯:9.2.4. All tests, inspections and controls on materials carried out by the Contractor, with or without the Buyer’s presence, will be listed in statements which will have to be sent by courier service to the Buyer in three (3) sets within two (2) weeks after the tests, inspections and controls.是什么意思?![]() ![]() 9.2.4. All tests, inspections and controls on materials carried out by the Contractor, with or without the Buyer’s presence, will be listed in statements which will have to be sent by courier service to the Buyer in three (3) sets within two (2) weeks after the tests, inspections and controls.
問題補充: |
|
2013-05-23 12:21:38
正在翻譯,請等待...
|
|
2013-05-23 12:23:18
*所有9.2.4.測試、檢查和控制對材料的承建商進行的,或沒有買方的存在,將被列在發言,將必須向買方發出由信使服務,三(3)套在兩(2)周內的測試、檢查和控制。
|
|
2013-05-23 12:24:58
正在翻譯,請等待...
|
|
2013-05-23 12:26:38
9.2.4.所有的測試、 檢查和承建商,或買方的存在,不進行材料上的控件將會有后測試、 檢驗和控件的速遞服務發送到買主在兩個 2 星期內三 3 集的報表中列出。
|
|
2013-05-23 12:28:18
正在翻譯,請等待...
|
湖北省互聯網違法和不良信息舉報平臺 | 網上有害信息舉報專區 | 電信詐騙舉報專區 | 涉歷史虛無主義有害信息舉報專區 | 涉企侵權舉報專區