|
關(guān)注:1
2013-05-23 12:21
求翻譯:在本標(biāo)準(zhǔn)實施前,環(huán)境影響報告書已批復(fù)的脫硫機組,以及位于西部非兩控區(qū)的燃用特低硫煤(入爐燃煤 收到基硫分小于 0.5%)的坑口電廠鍋爐執(zhí)行該限值。是什么意思?![]() ![]() 在本標(biāo)準(zhǔn)實施前,環(huán)境影響報告書已批復(fù)的脫硫機組,以及位于西部非兩控區(qū)的燃用特低硫煤(入爐燃煤 收到基硫分小于 0.5%)的坑口電廠鍋爐執(zhí)行該限值。
問題補充: |
|
2013-05-23 12:21:38
Prior to the implementation of this standard, the environmental impact report has been approved desulfurization unit, and two non-controlled areas in the west of the special low-sulfur coal-fired (coal into the furnace base received less than 0.5% sulfur) of the pit plant boiler implementation of th
|
|
2013-05-23 12:23:18
In the application of standards, environmental impact report has been approved before the desulphurization units located in the western region, as well as non-two controlled area of the fuel use of the low-sulfur coal (coal into the furnace, received less than 0.5 % sulfur-hang Hau boiler implementa
|
|
2013-05-23 12:24:58
Before this standard implementation, the environmental effect report already the desulphurization unit which gives a written reply to a subordinate west, as well as is located non-two controls the area burning (to enter stove with the especially low sulfur coal to burn coal receives base sulfur cont
|
|
2013-05-23 12:26:38
Prior to the implementation of this standard, environmental impact statement has been approved for desulfurization units, as well as Western Africa burning low-sulfur coal of the ICA (received as fired coal-fired base sulfur content is less than 0.5%) of mine power plant boilers to implement the lim
|
|
2013-05-23 12:28:18
Prior to the implementation of this standard, the environmental impact report has been approved desulfurization unit, and two non-controlled areas in the west of the special low-sulfur coal-fired (coal into the furnace base received less than 0.5% sulfur) of the pit plant boiler implementation of th
|
湖北省互聯(lián)網(wǎng)違法和不良信息舉報平臺 | 網(wǎng)上有害信息舉報專區(qū) | 電信詐騙舉報專區(qū) | 涉歷史虛無主義有害信息舉報專區(qū) | 涉企侵權(quán)舉報專區(qū)