|
關注:1
2013-05-23 12:21
求翻譯:Original project cost is based on working time for the month cycle statistics .Includes design costs, manufacturing costs, management costs, operating costs,However, there is no basis for work decomposition of work packages for cost是什么意思?![]() ![]() Original project cost is based on working time for the month cycle statistics .Includes design costs, manufacturing costs, management costs, operating costs,However, there is no basis for work decomposition of work packages for cost
問題補充: |
湖北省互聯網違法和不良信息舉報平臺 | 網上有害信息舉報專區 | 電信詐騙舉報專區 | 涉歷史虛無主義有害信息舉報專區 | 涉企侵權舉報專區