|
關注:1
2013-05-23 12:21
求翻譯:如果工程圖紙、工程數量發生修改,本造價相應增減,是什么意思?![]() ![]() 如果工程圖紙、工程數量發生修改,本造價相應增減,
問題補充: |
|
2013-05-23 12:21:38
null
|
|
2013-05-23 12:23:18
If engineering drawings, engineering quantity changes occur, the cost increase or decrease accordingly.
|
|
2013-05-23 12:24:58
If the project blueprint, project quantity has the revision, this construction cost corresponding fluctuation,
|
|
2013-05-23 12:26:38
If the engineering drawings, construction number is modified, this cost corresponding increase or decrease,
|
|
2013-05-23 12:28:18
null
|
湖北省互聯網違法和不良信息舉報平臺 | 網上有害信息舉報專區 | 電信詐騙舉報專區 | 涉歷史虛無主義有害信息舉報專區 | 涉企侵權舉報專區