求翻譯:The price of the EQUIPMENT and MATERIALS properly supplied in accordance with the itemized breakdown of the lump sum price, as per ARTICLE 21-1 and work done by CONTRACTOR as at the date of the termination, including the cost of terminating commitments made in good faith to SUB-CONTRACTORS or VENDORS, as substant是什么意思?![]() ![]() The price of the EQUIPMENT and MATERIALS properly supplied in accordance with the itemized breakdown of the lump sum price, as per ARTICLE 21-1 and work done by CONTRACTOR as at the date of the termination, including the cost of terminating commitments made in good faith to SUB-CONTRACTORS or VENDORS, as substant
問題補充: |
|
2013-05-23 12:21:38
正確總價逐項分列的規定,每篇文章21-1提供的設備和材料的價格和承包商在終止之日起,所做的工作包括善意取得終止承諾的成本分包商或供應商,從批準的工程進展將計算的百分比,并應支付的款項是根據有關逐項分列的價格計算的第21-1條所述的相同的百分比,比所有的適當的證據證實已支付給承包商的金額由公司,和少于哪一個承包商的所有款項一經定罪
|
|
2013-05-23 12:23:18
這, 那; 這些, 那些
|
|
2013-05-23 12:24:58
設備和材料的價格 適當地供應與總金額價格的被分條列述的故障符合,根據CONTRACTOR完成的文章21-1和工作和在終止的日期,包括終止承諾的費用真誠做了對轉承包商或供營商,如由適當的證據證實批準了工作的進展百分比將被計算,并且將被支付的總和根據從相關的被分條列述的故障價格計算的同一百分比比所有數額比承包商是有義務的所有數額陳述在文章21-1上和已經被支付對承包商由COMPANY,和
|
|
2013-05-23 12:26:38
從相關的設備和材料按照分項數字筆的價格,按第 21-1 條,如在日期的終止,包括終止向分包商或供應商,真誠地作出的承諾的費用便可以適當的證據證明從哪些已批準的工程進度百分比將計算和支付款項基于相同的百分比,承建商所做的工作的正常供應價格計算第 21-1 條所述的擊穿價格和小于所有款項已支付給承建商的公司,以及不少于所有金額可承建商被判的細項
|
|
2013-05-23 12:28:18
正確總價逐項分列的規定,每篇文章21-1提供的設備和材料的價格和承包商在終止之日起,所做的工作包括善意取得終止承諾的成本分包商或供應商,從批準的工程進展將計算的百分比,并應支付的款項是根據有關逐項分列的價格計算的第21-1條所述的相同的百分比,比所有的適當的證據證實已支付給承包商的金額由公司,和少于哪一個承包商的所有款項一經定罪
|