|
關注:1
2013-05-23 12:21
求翻譯:工程驗收過程無保留書面記錄,則缺少證明在建工程轉固時點合理性的依據。是什么意思?![]() ![]() 工程驗收過程無保留書面記錄,則缺少證明在建工程轉固時點合理性的依據。
問題補充: |
|
2013-05-23 12:21:38
null
|
|
2013-05-23 12:23:18
Works acceptance process without reservations, the lack of supporting written records in the construction of the fixed time point based on rationality.
|
|
2013-05-23 12:24:58
The acceptance of work process does not have the retention written record, then lacks the proof to construct the project to transfer the solid point in time rational basis.
|
|
2013-05-23 12:26:38
Written record of the engineering acceptance without reservations, the missing proof construction in turn fixed point basis for rationality.
|
|
2013-05-23 12:28:18
null
|
湖北省互聯網違法和不良信息舉報平臺 | 網上有害信息舉報專區 | 電信詐騙舉報專區 | 涉歷史虛無主義有害信息舉報專區 | 涉企侵權舉報專區