|
關注:1
2013-05-23 12:21
求翻譯:柱插筋及墻筋端部與墻角在施工過程中要進行校正與固定工作,墻中部按邊支座校正部位拉線校正與固定。確保位置準確,防止鋼筋位移。是什么意思?![]() ![]() 柱插筋及墻筋端部與墻角在施工過程中要進行校正與固定工作,墻中部按邊支座校正部位拉線校正與固定。確保位置準確,防止鋼筋位移。
問題補充: |
|
2013-05-23 12:21:38
Column dowels and end with the wall studs during construction work to be corrected and fixed, according to the central side wall correction parts of the pull stand corrected and fixed. To ensure accurate location, to prevent the steel displacement.
|
|
2013-05-23 12:23:18
正在翻譯,請等待...
|
|
2013-05-23 12:24:58
The column inserts the muscle and the wall muscle nose and the corner of a wall must carry on the adjustment and the fixed work in the construction process, middle the wall adjusts the spot back guy adjustment according to the side support and fixed.Guarantees the position to be accurate, prevents t
|
|
2013-05-23 12:26:38
Column walls and Steel Dowel bar ends and corners to make the correction in the construction process and a steady job, wall middle parts bearing correction line correction and fixed. Ensure that precisely to prevent reinforcement displacement.
|
|
2013-05-23 12:28:18
Column dowels and end with the wall studs during construction work to be corrected and fixed, according to the central side wall correction parts of the pull stand corrected and fixed. To ensure accurate location, to prevent the steel displacement.
|
湖北省互聯網違法和不良信息舉報平臺 | 網上有害信息舉報專區 | 電信詐騙舉報專區 | 涉歷史虛無主義有害信息舉報專區 | 涉企侵權舉報專區