|
關(guān)注:1
2013-05-23 12:21
求翻譯:裝置計(jì)劃開、停工,規(guī)定調(diào)整時(shí)間為24小時(shí), 非計(jì)劃開、停工,規(guī)定調(diào)整時(shí)間為48小時(shí),調(diào)整期內(nèi)不統(tǒng)計(jì)合格率,裝置開、停工以生產(chǎn)處編制的裝置開、停工月報(bào)為依據(jù)。是什么意思?![]() ![]() 裝置計(jì)劃開、停工,規(guī)定調(diào)整時(shí)間為24小時(shí), 非計(jì)劃開、停工,規(guī)定調(diào)整時(shí)間為48小時(shí),調(diào)整期內(nèi)不統(tǒng)計(jì)合格率,裝置開、停工以生產(chǎn)處編制的裝置開、停工月報(bào)為依據(jù)。
問(wèn)題補(bǔ)充: |
|
2013-05-23 12:21:38
Unit plans to open, lay-off, adjust the time requirement of 24 hours, non-plan open, lay-off, adjust the time requirement of 48 hours, the period of adjustment is not passing rate statistics, the device open, suspended production at the establishment of the unit open, stop Industry monthly basis.
|
|
2013-05-23 12:23:18
正在翻譯,請(qǐng)等待...
|
|
2013-05-23 12:24:58
Production installment correlation solution configurations and so on raw material process solution, solvent recovery and catalyst elutriate according to the craft configuration condition, after the adjustment qualified side may enter the system.Qualified rate statistics according to identical pot (b
|
|
2013-05-23 12:26:38
Installation planned, lay-off, provisions adjusted for 24 hours, unplanned opening, stoppage, require adjustment time of 48 hours adjustment period not statistical failure rates for unit opened, stoppage to device opening, stoppage of production department monthly basis.
|
|
2013-05-23 12:28:18
Device plans, stoppage, require adjustment time of 24 hours, non-planned, stoppage, require adjustment time of 48 hours, not statistical rate during the adjustment period, installation opening, stoppage of production department equipment opening and suspension of monthly report is based on.
|
湖北省互聯(lián)網(wǎng)違法和不良信息舉報(bào)平臺(tái) | 網(wǎng)上有害信息舉報(bào)專區(qū) | 電信詐騙舉報(bào)專區(qū) | 涉歷史虛無(wú)主義有害信息舉報(bào)專區(qū) | 涉企侵權(quán)舉報(bào)專區(qū)