求翻譯:the requirement to build in excess of one million square feet in a short timescale suggested a high degree of prefabrication ,including factory-finished modules,while the need to build downwards and upwards simultaneously led to the adoption of a suspension structure, with pairs of steel masts arrang是什么意思?![]() ![]() the requirement to build in excess of one million square feet in a short timescale suggested a high degree of prefabrication ,including factory-finished modules,while the need to build downwards and upwards simultaneously led to the adoption of a suspension structure, with pairs of steel masts arrang
問題補充: |
|
2013-05-23 12:21:38
超過一百萬平方英尺,在很短的時間尺度上建立的要求提出的預制高的程度,包括出廠成品模塊,而需要建立向下,向上同時通過一個懸掛結構鋼對,桅桿安排在三個海灣。
|
|
2013-05-23 12:23:18
這項規定,建立在超過一個000平方呎的短時間內建議高度的預制組件,包括工廠制成品單元而需要建立向下調高,同時,通過了一項暫停結構,對鋼鐵桅桿安排在三個避車處。
|
|
2013-05-23 12:24:58
要求修造超出一百萬平方英尺在一個短的時標建議了高度 預鑄,包括工廠完成的模塊,當需要修造向下和向上同時導致懸浮結構的采用,以被安排的對鋼帆柱在三個海灣時。
|
|
2013-05-23 12:26:38
生成的超過 100 萬平方呎短時間刻度中的規定建議的預制,包括工廠完成的模塊,而要向下和向上同時生成導致懸掛結構,通過對鋼桅桿排列 3 個機架的高度。
|
|
2013-05-23 12:28:18
生成的超過 100 萬平方呎短時間刻度中的規定建議的預制,包括工廠完成的模塊,而要向下和向上同時生成導致懸掛結構,通過對鋼桅桿排列 3 個機架的高度。
|