|
關注:1
2013-05-23 12:21
求翻譯:T梁采用與橋面板及橫隔板連接的措施連成整體,在隔板處施加橫向預應力。橋面倆側設人行道,人行道角鋼支座與預埋在擋碴墻處T型鋼栓接。軌底至梁底建筑高度為3.4m。 本文結合工程實例分別從工作機理、施工流程、質量檢驗三個方面對T梁做了闡述。是什么意思?![]() ![]() T梁采用與橋面板及橫隔板連接的措施連成整體,在隔板處施加橫向預應力。橋面倆側設人行道,人行道角鋼支座與預埋在擋碴墻處T型鋼栓接。軌底至梁底建筑高度為3.4m。 本文結合工程實例分別從工作機理、施工流程、質量檢驗三個方面對T梁做了闡述。
問題補充: |
|
2013-05-23 12:21:38
T-beam bridge decks and the use of diaphragm and the measures connected together into a whole, put in the partition at the transverse prestressing. Both side of the bridge set up sidewalk, sidewalk bearing angle and embedded in ballast retaining wall at the T-beam bolted. Bottom rail to the beam at
|
|
2013-05-23 12:23:18
Mr LEUNG used T with decks and transverse bulkhead connections linking the measures imposed on the whole, the divisions horizontal prestressed. both decks located adjacent sidewalks, sidewalks and pre-buried hexagonal steel bearings in the block wall street scum T dilatant bolted. beam bottom line b
|
|
2013-05-23 12:24:58
T Liang uses with the floorboard and the cross spacer connection measure company becomes the whole, in partition board place infliction crosswise pre-stressed.The bridge floor pair side supposes the sidewalk, the sidewalk angle steel support with buries in advance is keeping off is cut by broken gla
|
|
2013-05-23 12:26:38
T-beam bridge decks and diaphragm connected measures form a whole, of transverse prestress applied to separators. Both sides set the pavement of bridge deck, angle iron support and embedded in the sidewalk blocking t-shaped steel ballast wall to bolt. Flange to the end of beam building height of 3.4
|
|
2013-05-23 12:28:18
T-beam bridge decks and diaphragm connected measures form a whole, of transverse prestress applied to separators. Both sides set the pavement of bridge deck, angle iron support and embedded in the sidewalk blocking t-shaped steel ballast wall to bolt. Flange to beam construction is 3.4m. Constructio
|
湖北省互聯網違法和不良信息舉報平臺 | 網上有害信息舉報專區 | 電信詐騙舉報專區 | 涉歷史虛無主義有害信息舉報專區 | 涉企侵權舉報專區