|
關(guān)注:1
2013-05-23 12:21
求翻譯:網(wǎng)架結(jié)構(gòu)由于負(fù)荷加固,施工的先后順序和焊接收縮變形對結(jié)構(gòu)施工過程中和施工完畢后結(jié)構(gòu)的變形、構(gòu)件內(nèi)力有較大影響。因此,結(jié)合實(shí)際施工條件并采用ANSYS有限元軟件對不同施工過程進(jìn)行模擬分析。根據(jù)分析結(jié)果,確定合理的加固施工方案以及整個(gè)結(jié)構(gòu)在焊接殘余應(yīng)力的作用下產(chǎn)生起拱,為工程設(shè)計(jì)和施工提供科學(xué)參考是什么意思?![]() ![]() 網(wǎng)架結(jié)構(gòu)由于負(fù)荷加固,施工的先后順序和焊接收縮變形對結(jié)構(gòu)施工過程中和施工完畢后結(jié)構(gòu)的變形、構(gòu)件內(nèi)力有較大影響。因此,結(jié)合實(shí)際施工條件并采用ANSYS有限元軟件對不同施工過程進(jìn)行模擬分析。根據(jù)分析結(jié)果,確定合理的加固施工方案以及整個(gè)結(jié)構(gòu)在焊接殘余應(yīng)力的作用下產(chǎn)生起拱,為工程設(shè)計(jì)和施工提供科學(xué)參考
問題補(bǔ)充: |
|
2013-05-23 12:21:38
As the load reinforcement grid structure, sequence of construction and welding shrinkage of the structure of the construction process and construction of the structure after the deformation, internal force components have a greater impact. Therefore, with the actual construction conditions and the u
|
|
2013-05-23 12:23:18
Network Load reinforced, and the structure because the sequencing and construction welding shrink deformation during the course of building and construction of structures after power structure within the deformation, components have a much greater impact. Therefore, actual construction conditions AN
|
|
2013-05-23 12:24:58
The wire table structure as a result of the load reinforcement, the construction successively the smooth and the welding shrinkage strain finished the structure distortion, the component endogenic force after the structure construction process neutral construction has affects greatly.Therefore, the
|
|
2013-05-23 12:26:38
Grid structure reinforcement due to load, order of construction and welding shrinkage deformation of structures in construction process and construction after the deformation of the structure, components of internal force has a greater impact. Therefore, the actual construction conditions and the us
|
|
2013-05-23 12:28:18
Grid structure reinforcement due to load, order of construction and welding shrinkage deformation of structures in construction process and construction after the deformation of the structure, components of internal force has a greater impact. Therefore, the actual construction conditions and the us
|
湖北省互聯(lián)網(wǎng)違法和不良信息舉報(bào)平臺 | 網(wǎng)上有害信息舉報(bào)專區(qū) | 電信詐騙舉報(bào)專區(qū) | 涉歷史虛無主義有害信息舉報(bào)專區(qū) | 涉企侵權(quán)舉報(bào)專區(qū)