|
關(guān)注:1
2013-05-23 12:21
求翻譯:領(lǐng)導(dǎo)維修人員在3個(gè)半月內(nèi)完成了1400平米新廠房的電力、氣動、供水和照明安裝調(diào)試工作。完成設(shè)備的搬遷和重裝工作.節(jié)省費(fèi)用約10萬元.是什么意思?![]() ![]() 領(lǐng)導(dǎo)維修人員在3個(gè)半月內(nèi)完成了1400平米新廠房的電力、氣動、供水和照明安裝調(diào)試工作。完成設(shè)備的搬遷和重裝工作.節(jié)省費(fèi)用約10萬元.
問題補(bǔ)充: |
|
2013-05-23 12:21:38
Lead maintenance staff to complete in three and a half months of 1400 square meters of new power plants, air, water and lighting installation and commissioning work. Complete removal and reinstallation of equipment work cost savings of about 10 million.
|
|
2013-05-23 12:23:18
Leading maintenance personnel in three and a half months had been completed in new plant 1400 square meters of electrical, pneumatic, water supply and lighting installation and debugging. Completion of the relocation and re-install the equipment cost savings of some 100,000 million . .
|
|
2013-05-23 12:24:58
The leadership serviceman has completed 1400 square meter new workshop electric powers in 3 half a month, air operated, the water supply and the illumination installs the debugging work.Completes the equipment moving with the rewiring work. Saves the expense approximately 100,000 Yuan.
|
|
2013-05-23 12:26:38
Lead maintenance personnel completed in 3.5 months of 1400 square meter new building installation work of electrical, air, water and lighting. Complete equipment relocation and reload work. cost savings of about $ 100,000.
|
|
2013-05-23 12:28:18
Led the maintenance personnel completed in 3.5 months 1400 square meter new workshops of electricity, pneumatic and water and lighting installation and debugging work. Complete equipment relocation and reload work. cost savings of about $ 100,000.
|
湖北省互聯(lián)網(wǎng)違法和不良信息舉報(bào)平臺 | 網(wǎng)上有害信息舉報(bào)專區(qū) | 電信詐騙舉報(bào)專區(qū) | 涉歷史虛無主義有害信息舉報(bào)專區(qū) | 涉企侵權(quán)舉報(bào)專區(qū)