求翻譯: 1. 輕鋼龍骨隔墻施工中,工種間應保證已裝項目不受損壞,墻內電管及設備不得碰動錯位及損傷。是什么意思?![]() ![]() 1. 輕鋼龍骨隔墻施工中,工種間應保證已裝項目不受損壞,墻內電管及設備不得碰動錯位及損傷。
問題補充: |
|
2013-05-23 12:21:38
1 metal frame wall construction, trades should guarantee between the project have been installed without damage to pipe walls and electrical equipment shall not touch moving dislocation and damage.
|
|
2013-05-23 12:23:18
1) Light steel Keel-wall construction and trades should ensure that projects have been installed inside the wall from damage, electric pipe and equipment shall not touch interactive mangled and injury.
|
|
2013-05-23 12:24:58
1. In the light steel keel partition wall construction, the kind of work in a factory should guarantee already installs the project not to receive damages, in the wall the electric tube and the equipment do not have to bump move the dislocation and the damage.
|
|
2013-05-23 12:26:38
1. light steel frame wall construction, should guarantee jobs has been shipped item is not damaged, electric pipe wall and equipment shall not touch moving dislocation and injury.
|
|
2013-05-23 12:28:18
1. light steel frame wall construction, should guarantee jobs has been shipped item is not damaged, electric pipe wall and equipment shall not touch moving dislocation and injury.
|