求翻譯:甲方如對產品安裝工程提出變更時,應在乙方施工前提出,否則應承擔必要的返工及材料費用和延誤工期的責任,如對產品型號、尺寸改變,應在下料之前,否則一切責任由甲方承擔。是什么意思?![]() ![]() 甲方如對產品安裝工程提出變更時,應在乙方施工前提出,否則應承擔必要的返工及材料費用和延誤工期的責任,如對產品型號、尺寸改變,應在下料之前,否則一切責任由甲方承擔。
問題補充: |
|
2013-05-23 12:21:38
Party, such as the installation of the product proposed changes should be made before construction B, or should bear the necessary rework and material costs and delays in schedule of responsibilities, such as product type, size change, should be before the next feeding, otherwise all the responsibil
|
|
2013-05-23 12:23:18
A Party shall, if the product installation works in a time of change, Party B shall be made before construction, otherwise it should assume the necessary 264,165 2006/4 and material costs and delays, such as the responsibility of product type, size, and should be changed, otherwise, all before next
|
|
2013-05-23 12:24:58
The party of the first part like the installation work to the product to propose when change before, should construct in the second party proposed, otherwise should undertake essential doing over and the material expense and the delay time limit for a project responsibility, like to the product mode
|
|
2013-05-23 12:26:38
Party a if the product installation so changes should be made before the construction of party b, you should take the necessary responsibility of rework and materials costs and missed deadlines, such as on the product model, the size changes should be before the next, otherwise all the responsibilit
|
|
2013-05-23 12:28:18
Party a if the product installation so changes should be made before the construction of party b, you should take the necessary responsibility of rework and materials costs and missed deadlines, such as on the product model, the size changes should be before the next, otherwise all the responsibilit
|