|
關(guān)注:1
2013-05-23 12:21
求翻譯:應(yīng)根據(jù)擬開采含水層(組、段)的埋深、厚度、水質(zhì)、富水性及其出水能力等因素綜合確定.是什么意思?![]() ![]() 應(yīng)根據(jù)擬開采含水層(組、段)的埋深、厚度、水質(zhì)、富水性及其出水能力等因素綜合確定.
問題補充: |
|
2013-05-23 12:21:38
Aquifer to be mined in accordance with (group, above) the depth, thickness, water quality, rich water and its water capacity and other factors to determine.
|
|
2013-05-23 12:23:18
should be in accordance with paragraph to be mined aquifer (Group), the buried deep, thickness, water quality, water-rich, and its capacity out of the water, such as the determining factor.
|
|
2013-05-23 12:24:58
Should act according to plans to mine the water-bearing stratum (group, section) factor synthesis determinations and so on the burying depth, thickness, water quality, Fushui and water leakage ability.
|
|
2013-05-23 12:26:38
According to the intended exploitation of the aquifer (Group, segment) the depth, thickness, water quality, rich water and effluent from such factors as integral.
|
|
2013-05-23 12:28:18
According to the intended exploitation of the aquifer (Group, segment) the depth, thickness, water quality, rich water and effluent from such factors as integral.
|
湖北省互聯(lián)網(wǎng)違法和不良信息舉報平臺 | 網(wǎng)上有害信息舉報專區(qū) | 電信詐騙舉報專區(qū) | 涉歷史虛無主義有害信息舉報專區(qū) | 涉企侵權(quán)舉報專區(qū)