求翻譯:在洞外分片制作,人工鋪設。鋼筋網隨受噴面起伏鋪設與受噴面的間隙一般為3cm,鋼筋網的噴射混凝土保護層厚度不小于2cm,鋼筋網應與錨桿或其它穩定裝置連接牢固,噴射混凝土時鋼筋網應不晃動。向鋼筋網噴射混凝土時,噴頭應稍微傾斜,網后混凝土的流動性應大一些,以使噴射密實。是什么意思?![]() ![]() 在洞外分片制作,人工鋪設。鋼筋網隨受噴面起伏鋪設與受噴面的間隙一般為3cm,鋼筋網的噴射混凝土保護層厚度不小于2cm,鋼筋網應與錨桿或其它穩定裝置連接牢固,噴射混凝土時鋼筋網應不晃動。向鋼筋網噴射混凝土時,噴頭應稍微傾斜,網后混凝土的流動性應大一些,以使噴射密實。
問題補充: |
|
2013-05-23 12:21:38
Fragments produced in the hole, the laying of artificial. Steel mesh with the undulating surface by the spray by spraying the surface with the laying of the gap is usually 3cm, steel mesh protective layer of sprayed concrete thickness of not less than 2cm, steel mesh should be stable and bolt or oth
|
|
2013-05-23 12:23:18
Outside the cave, artificial laying sub-film production. Steel-oriented web vary according to the spray coating and ups and downs with the spray of GAP is normally 3cm steel reinforcement web of shotcrete protection layer thickness not less than 2 cm, steel shank and Internet should be connected dev
|
|
2013-05-23 12:24:58
Outside the hole the lamination manufacture, the man-power lays down.The mat reinforcement along with receives spurts the surface fluctuation to lay down with is spurted the surface the gap is generally 3cm, mat reinforcement shotcrete protector thickness is not smaller than 2cm, the mat reinforceme
|
|
2013-05-23 12:26:38
Fragment produced outside the hole, manual laying. Mat reinforcement with spraying surface laid in ups and downs and the spray surface clearance of General 3cm, steel fabric shotcrete protection layer thickness of not less than 2cm, steel mesh and anchor rod or other stable solid connection, when sp
|
|
2013-05-23 12:28:18
Outside the hole the lamination manufacture, the man-power lays down.The mat reinforcement along with receives spurts the surface fluctuation to lay down with is spurted the surface the gap is generally 3cm, mat reinforcement shotcrete protector thickness is not smaller than 2cm, the mat reinforceme
|