|
關注:1
2013-05-23 12:21
求翻譯:本項目隧道施工時,為減少對圍巖的擾動,采用光面爆破技術,并根據不同的圍巖級別進行分臺階施工。(具體的總體施工步驟見本章節的相關內容)是什么意思?![]() ![]() 本項目隧道施工時,為減少對圍巖的擾動,采用光面爆破技術,并根據不同的圍巖級別進行分臺階施工。(具體的總體施工步驟見本章節的相關內容)
問題補充: |
|
2013-05-23 12:21:38
The tunnel construction project, in order to reduce disturbance of the surrounding rock, the use of smooth blasting techniques, and according to different levels of rock sub-step construction. (See specific steps in the overall construction of the relevant content in this section)
|
|
2013-05-23 12:23:18
When the tunnel construction projects that, in order to reduce the scope of rock blasting perturbations, using solar technology, and under different levels of Wai Yan sub-stage construction. The overall construction (concrete steps in this section related content)
|
|
2013-05-23 12:24:58
When this project tunnel constructs, is the reduction to the adjacent formation perturbation, uses the refacing demolition technology, and carries on the minute stair construction according to the different adjacent formation rank.(Concrete overall construction steps see this chapter related content
|
|
2013-05-23 12:26:38
When this project tunnel construction, in order to minimise disturbance to the surrounding rock, the use of smooth blasting technology and depending on the level of surrounding rocks in bench construction. (General construction of specific steps, see the section of related content)
|
|
2013-05-23 12:28:18
When this project tunnel constructs, is the reduction to the adjacent formation perturbation, uses the refacing demolition technology, and carries on the minute stair construction according to the different adjacent formation rank.(Concrete overall construction steps see this chapter related content
|
湖北省互聯網違法和不良信息舉報平臺 | 網上有害信息舉報專區 | 電信詐騙舉報專區 | 涉歷史虛無主義有害信息舉報專區 | 涉企侵權舉報專區