|
關(guān)注:1
2013-05-23 12:21
求翻譯:101和102工房的空調(diào)送風(fēng)管布局與原設(shè)計(jì)出入較大,且總包單位提供的方案中空調(diào)送風(fēng)管不宜穿過本系統(tǒng)無關(guān)房間(除塵間)。由于原設(shè)計(jì)方案中的風(fēng)管布局是經(jīng)法方確認(rèn)過的,總包單位提供的方案需法方進(jìn)行再次確認(rèn)。是什么意思?![]() ![]() 101和102工房的空調(diào)送風(fēng)管布局與原設(shè)計(jì)出入較大,且總包單位提供的方案中空調(diào)送風(fēng)管不宜穿過本系統(tǒng)無關(guān)房間(除塵間)。由于原設(shè)計(jì)方案中的風(fēng)管布局是經(jīng)法方確認(rèn)過的,總包單位提供的方案需法方進(jìn)行再次確認(rèn)。
問題補(bǔ)充: |
|
2013-05-23 12:21:38
101 and 102 of air conditioning pipe layout with the original design of the Kobo and out, and the total package units program should not pass through the air conditioning blower duct system independent of the room (dust between). Since the original duct design layout is recognized by the French side
|
|
2013-05-23 12:23:18
The 101 and 102 of the air-conditioned air supply tube layout with the original design, there is considerable variation between units and a total package of the program provided in air-conditioned supply air through the tube is not the system-independent rooms (dust). In the original design of the
|
|
2013-05-23 12:24:58
101 and 102 workshop air conditioning wind pipe layouts are big with the original design difference, also always wraps in the plan which the unit provides the air conditioning wind pipe to pass through this system to have nothing to do with not suitably the room (dust removal).Because in the origina
|
|
2013-05-23 12:26:38
101 and 102 ft larger air conditioning pipe layout and original design, and the total package unit air conditioning pipes should not be in the programme provided through the system-independent room (dust). Since the original design of the wind pipe layout is confirmed by the French, General Contract
|
|
2013-05-23 12:28:18
正在翻譯,請(qǐng)等待...
|
湖北省互聯(lián)網(wǎng)違法和不良信息舉報(bào)平臺(tái) | 網(wǎng)上有害信息舉報(bào)專區(qū) | 電信詐騙舉報(bào)專區(qū) | 涉歷史虛無主義有害信息舉報(bào)專區(qū) | 涉企侵權(quán)舉報(bào)專區(qū)