求翻譯:每搭設兩步架后必須進行檢查驗收,并填寫懸挑腳手架驗收表。是什么意思?![]() ![]() 每搭設兩步架后必須進行檢查驗收,并填寫懸挑腳手架驗收表。
問題補充: |
|
2013-05-23 12:21:38
Must be carried out in the after every erection of a two-step frame inspection and acceptance, and fill out the cantilevered scaffolding acceptance table.
|
|
2013-05-23 12:23:18
Set up a two-step after acceptance, you must check out suspension scaffolds and fill out acceptance form.
|
|
2013-05-23 12:24:58
Puts up two step frame to have after every time to carry on the inspection approval, and fills in hangs selects the scaffold approval table.
|
|
2013-05-23 12:26:38
Each putting up two steps must be carried out after inspection and acceptance, and fill out the acceptance form of overhanging scaffold.
|
|
2013-05-23 12:28:18
正在翻譯,請等待...
|