|
關(guān)注:1
2013-05-23 12:21
求翻譯:2011年?duì)款^負(fù)責(zé)集團(tuán)審計(jì)信息系統(tǒng)的開(kāi)發(fā),全程參與了前期調(diào)研、軟件公司招投標(biāo)、選型、定型、協(xié)助二次開(kāi)發(fā)、一期試運(yùn)行、一期驗(yàn)收、二期研發(fā)等工作,目前該系統(tǒng)一期已成功在集團(tuán)本部及下屬上市公司、造船廠等前6大公司上線。是什么意思?![]() ![]() 2011年?duì)款^負(fù)責(zé)集團(tuán)審計(jì)信息系統(tǒng)的開(kāi)發(fā),全程參與了前期調(diào)研、軟件公司招投標(biāo)、選型、定型、協(xié)助二次開(kāi)發(fā)、一期試運(yùn)行、一期驗(yàn)收、二期研發(fā)等工作,目前該系統(tǒng)一期已成功在集團(tuán)本部及下屬上市公司、造船廠等前6大公司上線。
問(wèn)題補(bǔ)充: |
|
2013-05-23 12:21:38
2011 to take charge of the Group audit information system development, full participation in the preliminary investigation, the software company bidding, selection, stereotypes, assist secondary development, a trial run, an acceptance, and two research and development work, the system is currently a
|
|
2013-05-23 12:23:18
In 2011 the group lead for the development of information systems, and full participation in the up-front research, and software companies bidding, selection, stereotypes, to assist in development, a 2 time period, a test-run phase 2 acceptance, such as research and development work, the system has
|
|
2013-05-23 12:24:58
In 2011 coordinated is responsible for the group audit information system the development, the entire journey participates in the earlier period investigation and study, the software company has incurred the bid, the shaping, the stereotypia, assists the re-development, an issue to try to move, issu
|
|
2013-05-23 12:26:38
Lead 2011 for group audit information system development, participated companies bidding, the preliminary investigation, software selection, training, assisting the secondary development, commissioning, acceptance, with a second phase of research and development work, at present, the system has been
|
|
2013-05-23 12:28:18
正在翻譯,請(qǐng)等待...
|
湖北省互聯(lián)網(wǎng)違法和不良信息舉報(bào)平臺(tái) | 網(wǎng)上有害信息舉報(bào)專區(qū) | 電信詐騙舉報(bào)專區(qū) | 涉歷史虛無(wú)主義有害信息舉報(bào)專區(qū) | 涉企侵權(quán)舉報(bào)專區(qū)