|
關(guān)注:1
2013-05-23 12:21
求翻譯:After laying of pipelines on the basis of the ditch, they should be covered with sand or sieved soil, watered and compacted with at least 25 inches tall. This set ducts covered with 30 cm of compacted sand is referred to herein by block pipelines.是什么意思?![]() ![]() After laying of pipelines on the basis of the ditch, they should be covered with sand or sieved soil, watered and compacted with at least 25 inches tall. This set ducts covered with 30 cm of compacted sand is referred to herein by block pipelines.
問題補充: |
|
2013-05-23 12:21:38
的基礎(chǔ)上的溝,管道鋪設(shè)后,應(yīng)覆蓋著沙子或過篩土,澆水,壓實至少25英寸高。這一套管道覆蓋的30厘米長的壓實的砂,在此被稱為由塊管道。
|
|
2013-05-23 12:23:18
在埋設(shè)管道的基礎(chǔ)上的溝渠,它們應(yīng)涵蓋沙或已過濾土壤、淡化和壓縮,至少有25英寸高。 這套管道覆蓋30cm土壤板結(jié)的沙子都是本文提到的管道阻塞。
|
|
2013-05-23 12:24:58
在放置管道以后根據(jù)壟溝,應(yīng)該用沙子或被篩的土壤蓋,澆灌和變緊密他們以至少25英寸高。 這個集合輸送用變緊密的沙子cm由塊管道此中提到的30蓋。
|
|
2013-05-23 12:26:38
后鋪設(shè)管道溝里的基礎(chǔ)上,他們應(yīng)該用砂覆蓋或篩分土、 澆水和碾壓與至少 25 英尺高。此設(shè)置覆蓋著 30 厘米的壓實的管道砂本條所指的塊管道。
|
|
2013-05-23 12:28:18
在水溝的基礎(chǔ)上的管道的放之后,他們應(yīng)該被沙覆蓋或 sieved 以至少 25 英寸高被澆水和壓縮的土壤。這套的管道被壓縮的沙的 30 厘米覆蓋于此按一批的傳遞途徑被提到。
|
湖北省互聯(lián)網(wǎng)違法和不良信息舉報平臺 | 網(wǎng)上有害信息舉報專區(qū) | 電信詐騙舉報專區(qū) | 涉歷史虛無主義有害信息舉報專區(qū) | 涉企侵權(quán)舉報專區(qū)