求翻譯:第三步:地面完全干燥后,土建在地面做雙層SBS防潮,防潮層上翻到屏蔽墻面30cm.是什么意思?![]() ![]() 第三步:地面完全干燥后,土建在地面做雙層SBS防潮,防潮層上翻到屏蔽墻面30cm.
問題補充: |
|
2013-05-23 12:21:38
The third step: the ground is completely dry, the civil works on the ground to do the double sbs moisture-proof, moisture-proof layer turn shield wall 30cm.
|
|
2013-05-23 12:23:18
Step 3: above-ground dry completely, and the building on the ground doing double SBS moisture, moisture level up to the Shield Wall 30 cm .
|
|
2013-05-23 12:24:58
Third step: After the ground is completely dry, the construction makes double-decked SBS in the ground to be moisture-proof, the dampproof course upturns to shield wall surface 30cm.
|
|
2013-05-23 12:26:38
Third step: to dry completely on the ground, construction on the ground doing double SBS moisture-proof, moisture-proof layer to shield the walls 30cm.
|
|