|
關注:1
2013-05-23 12:21
求翻譯:把從電柜經過機身后側金屬走線槽的主軸制動線也剝去外皮,然后從主軸制動接線盒的左邊的塑料管接頭里面穿入接線盒,壓好端子,1號線與二極管帶熱縮管的線接到一起,2號線與接地線接到一起。接完后把接線盒的蓋子蓋上,擰緊螺絲。是什么意思?![]() ![]() 把從電柜經過機身后側金屬走線槽的主軸制動線也剝去外皮,然后從主軸制動接線盒的左邊的塑料管接頭里面穿入接線盒,壓好端子,1號線與二極管帶熱縮管的線接到一起,2號線與接地線接到一起。接完后把接線盒的蓋子蓋上,擰緊螺絲。
問題補充: |
|
2013-05-23 12:21:38
Go trough the spindle from the electrical cabinet through the fuselage rear metal brake line is also stripped of skin penetration from the spindle brake junction box on the left of the plastic fittings inside the junction box, the pressure terminals, on the 1st line diode with heat-shrinkable tube c
|
|
2013-05-23 12:23:18
The fuselage from the cabinet after the metal side go online slot of the spindle brake line is stripped from the spindle, and then brake junction box on the left of the plastic pipe and into the junction box, and press the terminal, line 1 and 2 pole with the heat-shrink tubing, cable to a No. 2 and
|
|
2013-05-23 12:24:58
正在翻譯,請等待...
|
|
2013-05-23 12:26:38
Side metal from the Cabinet after body walk trough the spindle brake lines are decorticate, and then from the spindle brake wiring box inside the plastic pipe fittings into the junction box to the left of, good Terminal, Line 1 line together with the diodes with heat shrinkable tubing lines received
|
|
2013-05-23 12:28:18
Walks the trunking main axle system generatrix also husk from the electricity cabinet after the fuselage rear end metal, then penetrates the connecting box from inside the main axle brake connecting box left side plastic pipe connection, presses the post, 1 line and the diode belt pyrocondensation t
|
湖北省互聯(lián)網(wǎng)違法和不良信息舉報平臺 | 網(wǎng)上有害信息舉報專區(qū) | 電信詐騙舉報專區(qū) | 涉歷史虛無主義有害信息舉報專區(qū) | 涉企侵權舉報專區(qū)