求翻譯:基礎混凝土澆筑應分層進行,采用插入式振動棒振搗。振動棒不得觸及鋼筋、模板、預埋螺栓等。澆筑混凝土時應對稱下料,防止螺栓位移。并在砼澆筑完后,再復查螺栓位置和外露尺寸。是什么意思?![]() ![]() 基礎混凝土澆筑應分層進行,采用插入式振動棒振搗。振動棒不得觸及鋼筋、模板、預埋螺栓等。澆筑混凝土時應對稱下料,防止螺栓位移。并在砼澆筑完后,再復查螺栓位置和外露尺寸。
問題補充: |
|
2013-05-23 12:21:38
|
|
2013-05-23 12:23:18
poured concrete foundations should be layered, and vibration in plug-in in the league. Vibrating steel rods do not have to touch, templates, pre-ground bolts, and so on. When pouring concrete, that should prevent bolt shift. And when you have finished pouring on behalf, and then review bolt position
|
|
2013-05-23 12:24:58
The foundation concrete construction should the lamination carry on, uses the jack-in vibrating spear to inspire pounds.The vibrating spear does not have to touch the steel bar, the template, buries the bolt in advance and so on.When concrete should the symmetrical yummy treats, prevent the bolt dis
|
|
2013-05-23 12:26:38
Base concrete should be layered, plug-in vibrator vibrating. Vibrator may not touch the bar, templates, embedded bolts. When pouring concrete cutting, preventing the displacement bolts. And after finished concrete pouring, and then review the bolt exposed location and size.
|
|