|
關注:1
2013-05-23 12:21
求翻譯:11.1.13 As for area affected by heavy rigging work, Contractor shall take into consideration and plan his work to be performed post to heavy rigging work execution. Contractor is requested to construct soil improvement and ground reinforcement work in the affected area within the limited time frame. The incurred cost s是什么意思?![]() ![]() 11.1.13 As for area affected by heavy rigging work, Contractor shall take into consideration and plan his work to be performed post to heavy rigging work execution. Contractor is requested to construct soil improvement and ground reinforcement work in the affected area within the limited time frame. The incurred cost s
問題補充: |
|
2013-05-23 12:21:38
11.1.13為受影響地區的重型吊裝工作,承包商應考慮和他的工作計劃后進行重型吊裝工作執行。承包商被要求在有限的時間框架內構建在受影響地區的土壤改良和地基加固工作。費用應包括在合同
|
|
2013-05-23 12:23:18
13.11.1*受影響的區域的重型裝配工作,承包商應考慮到他的工作和計劃執行開機自檢重裝配工作執行。 承建商要求構建土壤改良和地面加固工作受影響的地區在有限的時間內。 所引起的費用應包括在合同
|
|
2013-05-23 12:24:58
11.1.13 關于繁重索具工作的影響的區域,承包商將考慮到并且計劃他的工作是執行的崗位到重的索具工作施行。 承包商在受影響的區域請求修建土壤改良和地面增強工作在有限的時間表之內。 招致的費用在合同將包括
|
|
2013-05-23 12:26:38
11.1.13 受重索具的工作區,承建商應考慮和計劃他的工作被執行重索具工作執行開機自檢。承建商要求構建土壤改良和在有限的時間范圍內的受影響地區地面加固工作。而招致的費用須包括在合同
|
|
2013-05-23 12:28:18
11.1.13 至于地區受重的索具工作影響,承包商將考慮和計劃有待實行的他的工作張貼到重的索具工作
|
湖北省互聯網違法和不良信息舉報平臺 | 網上有害信息舉報專區 | 電信詐騙舉報專區 | 涉歷史虛無主義有害信息舉報專區 | 涉企侵權舉報專區