求翻譯:填石路堤填筑前必須先用大塊石碼好邊坡,再開始填筑。填筑時,應(yīng)將石塊大面向下,擺放平穩(wěn),緊密靠攏,縫隙均以小石塊和石屑滿,然后再碾壓。如有石料粒徑過大的則要用小空壓機(jī)放炮解小,才可進(jìn)行施工。是什么意思?![]() ![]() 填石路堤填筑前必須先用大塊石碼好邊坡,再開始填筑。填筑時,應(yīng)將石塊大面向下,擺放平穩(wěn),緊密靠攏,縫隙均以小石塊和石屑滿,然后再碾壓。如有石料粒徑過大的則要用小空壓機(jī)放炮解小,才可進(jìn)行施工。
問題補(bǔ)充: |
|
2013-05-23 12:21:38
Rock fill embankment before the code must be good with a large rock slope, then start filling. Filling, should face down large stones, placed in a smooth, tightly close, small gaps are filled with stones and stone chips, and then rolled. If the stone size is too large the solution is to use a small
|
|
2013-05-23 12:23:18
Reclaimed stone embankment reclamation must be used first before chunks good side slope, stone yards longer start reclaimed. Reclamation will be throwing stones at Omo downward, should be placed in a smooth and seamless are closely aligned with small stones and gravel, and then crushing expires. If
|
|
2013-05-23 12:24:58
In front of the rock fill embankment reclamation must use the big rubble stone code good side slope first, then starts the reclamation.When reclamation, should the stone face under, the place be greatly steady, close stem for stem, slit by small stone and Shi Xieman, then again roller compaction.If
|
|
2013-05-23 12:26:38
Before the rock-filled embankment slope must be first with Boulder codes, and start filling. When the filling should be under the rock-oriented, placed a smooth, close close up, gaps are small stones and stone chip and then rolled. If aggregate particle size is too large to small air compressor firi
|
|
2013-05-23 12:28:18
Rock fill embankment before the code must be good with a large rock slope, then start filling. Filling, should face down large stones, placed in a smooth, tightly close, small gaps are filled with stones and stone chips, and then rolled. If the stone size is too large the solution is to use a small
|