求翻譯:有關(guān)樁的制作、吊裝、運(yùn)輸、接樁等施工過程中的要求遵照圖集中的規(guī)定。制樁及打樁過程中,遇到異常情況及與地勘報(bào)告結(jié)果不符時,應(yīng)及時與業(yè)主、設(shè)計(jì)單位、勘察單位聯(lián)系,共同處理。是什么意思?![]() ![]() 有關(guān)樁的制作、吊裝、運(yùn)輸、接樁等施工過程中的要求遵照圖集中的規(guī)定。制樁及打樁過程中,遇到異常情況及與地勘報(bào)告結(jié)果不符時,應(yīng)及時與業(yè)主、設(shè)計(jì)單位、勘察單位聯(lián)系,共同處理。
問題補(bǔ)充: |
|
2013-05-23 12:21:38
Production of the pile, lifting, transportation, then the pile construction process requirements in accordance with the provisions of atlases. , The piles and the piling process, encounter anomalies and inconsistent with the geological survey report results with the owners, design units, contact the
|
|
2013-05-23 12:23:18
The pile of production, lifting, transportation, access to piles in the course of construction, in accordance with the requirements of the concentration. A piling and piling process, abnormality and survey results of the report does not match with the owner should be timely, design, survey, common.
|
|
2013-05-23 12:24:58
Related construction process and so on in pile manufacture, hoisting, transportation, pile extension request deference atlas stipulations.The system pile and cuts in line in the process, encounters the unusual situation and when compares the report result not symbol with the place, should promptly w
|
|
2013-05-23 12:26:38
Production, lifting, transporting about piles, piles of construction requirement in accordance with provisions in a figure set. Piles and pile in the course of geological prospecting report results in the face of exceptional conditions and does not fit, contact owners, design units, reconnaissance u
|
|
2013-05-23 12:28:18
正在翻譯,請等待...
|