|
關注:1
2013-05-23 12:21
求翻譯:規劃用地東西兩側的城市次干道分別有梅康路、中康路,南側為主干道梅林路。外圍道路北側有梅關高速,南側有北環大道,東側有彩田路。是什么意思?![]() ![]() 規劃用地東西兩側的城市次干道分別有梅康路、中康路,南側為主干道梅林路。外圍道路北側有梅關高速,南側有北環大道,東側有彩田路。
問題補充: |
|
2013-05-23 12:21:38
Planned land east and west sides of the city roads, respectively, Mei Kang Road, Hong Road, south of the main road, Meilin Road. Peripheral road the north Mei Guan high-speed, the south side of North Central Avenue, east Caitian Road.
|
|
2013-05-23 12:23:18
Land use planning both the east and west side of the city, De on roads and road, the road to the south side-based Merlin road corridors. There is a perimeter road on the north of the south side is a high-speed, North Central Avenue, east side there are also Tin Road.
|
|
2013-05-23 12:24:58
The plan uses the thing both sides city inferior yang or male principle to have Mei Kang Lu separately, the Kang road, the south side primarily yang or male principle merring road.The periphery path north side has the plum to close high speed north, the south side has the link main road, the east si
|
|
2013-05-23 12:26:38
Planning and West of respective plum of urban secondary trunk road Kang road, zhongkanglu, South side of main road meilin road. High speed peripheral roads north of Mei Guan, beihuan road, South side, caitian road, on the East side.
|
|
2013-05-23 12:28:18
正在翻譯,請等待...
|
湖北省互聯網違法和不良信息舉報平臺 | 網上有害信息舉報專區 | 電信詐騙舉報專區 | 涉歷史虛無主義有害信息舉報專區 | 涉企侵權舉報專區